CURRENT & PAST CONTRACTS

VISY GLASS PROJECT APOLLO

Project Name:    Visy Glass Project Apollo
Client:                 Visy Industries Australia Pty Ltd
Project Value:     $18 Million
Date:                   February 2023 – Current

Challenges:

– Cut and fill 139,000m3
– Rock excavation
– ASS treatment and placement
– HEIC ground improvement

Scope of works:     Stage 1:

12 ha site clearing and bulk excavation contrast for new glass recycling and manufacturing facility comprising integrated recycled glass cullet plant (furnace – ready recycled glass) container glass manufacturing and finished goods warehouse facility. This development will initially process approximately 145,000 tonnes per annum of recycled material into furnace ready cullet and will manufacture approximately 200,000 tones (960,000,000 containers) per year.

Proudly working alongside

 

CANNON HILL GOLF COURSE

Project Name:    Cannon Hill Golf Course
Client:                   McMahons Pty Ltd
Project Value:     $100,000
Date:                       March 2021 – June 2021

The new public golf course will be Brisbane’s first public golf course in 70 years and the only public golf course south of Brisbane River located on 1825 Creek Road, Cannon Hill. The golf course will be similiar in specification to Council’s existing golf courses such as St Lucia and Victoria Park.

The project will also involve enhancement, revegetation, and landscaping of over 100 hectares of the site, including the squirrel glider habitat remediation works involving the establishment of grasslands and wetlands, as well as the planting of trees.

See https://crossriverrail.qld.ghttps://www.brisbane.qld.gov.au/things-to-see-and-do/outdoor-activities/golf/cannon-hill-community-links-development-projectv.au/ for further information regarding the project.

Scope of works: 

–  Supply of tunnel spoil and drainage product.

Proudly working alongside

PETRIE MILL REDEVELOPMENT

Project Name:    Petrie Mill Redevelopment
Client:                    McMahon Services
Project Value:     $1.6 Million
Date:                       August 2020 – July 2021

The Mill at Moreton Bay Priority Development Area (PDA) will facilitate the development of the University of the Sunshine Coast Moreton Bay campus. It also aims to fast-track transport related development in the existing Petrie Town Centre and land near the Kallangur and Lawnton train stations. It includes the existing Petrie Town Centre to the west of Petrie Station and land to the south of the new Kallangur station and covers an area of approximately 460 hectares.

The redevelopment of the former paper mill site will include the construction of the University of the Sunshine Coast Moreton Bay campus, new health, retail, commercial and residential developments and community infrastructure.

Scope of works:    Haulage Contractor carrying out the following:

– Supply of processed 30mm minus tunnel spoil
– Stockpiling of material offsite for testing, stockpile management in compliance with Quality Control Procedures
– Import of material at target supply rate of 5,500-3,000t/day

Challenges:   24 hours, 6 days per week.

Proudly working alongside

CROSS RIVER RAIL

Project Name:    Cross River Rail
Client:                    CBGU JV
Project Value:     $25 Million
Date:                       April 2020 – End of 2022

Cross River Rail is a critical public transport infrastructure which will improve our quality of life, help our economy keep growing, generate thousands of jobs, and activate urban development across the whole region, by delivering a second river crossing, allowing more trains to run more often and integrating with new roads and new bus services to enable a turn-up-and-go transport system across the whole of South East Queensland.

Timms Haulage have a joint partnership for spoil haulage with Lantrak resource combing our expertise enables us to manage the large volume of tunnel spoil generated from this project both quickly and effectively.

The works are anticipated to be completed late 2022 (pending weather and COVID-19 measures).

See https://crossriverrail.qld.gov.au/ for further information regarding the project.

Scope of works:    Spoil Haulage Contractor carrying out the following:

– Major spoil haulage of Rock, Concrete, Contaminated soils and Acid Sulphate Soils
– In excess of 2,000,000m3
– GPS tracking to all vehicles to maintain project haul route compliance

Challenges:   24 hours, 6 days per week.

Proudly working alongside

CARSELDINE VILLAGE – STAGE 1, 2

Project Name:    Carseldine Village – Beams Rd, Carseldine
Client:                    Shadforth
Date:                       May 2020 – 2020

Stage 1 of Carseldine Village’s anticipates to consist of an aged care/retirement development and 53 terrace residential lots linking to three nearby intersections to and from the village.

The works are anticipated to be completed late 2020 (pending weather and COVID-19 measures).

See https://haveyoursay.dsdmip.qld.gov.au/carseldine for further information regarding the project.

Scope of works:    Earthworks Haulage Contractor carrying out the following:

– Use of calibrated digital scale system on all trucks, with print out facility in truck cab.
– GPS Tracking to all vehicles to maintain project haul route compliance.
– Bulk Earthworks: Importing 40,000m3 of Solid Shale from Queens Wharf

Challenges:   It will be challenging working with weather permitting to get around site.

Proudly working alongside

LOT 56, 66 & 70 WEYERS RD, NUDGEE – RESIDENTIAL SUBDIVISION

Project Name:    Weyers Rd Residential Subdivision Lots 56, 66 & 70
Client:                    Shadforth
Project Value:    $3.6m
Date:                       May 2020 – June 2020

Plans for 79 residential lots located on Weyers Rd, Nudgee. These residential lots will be close to shops and amenities and have quick access to main Motorways.

Scope of works:    Haulage Contractor carrying out the following:

– Use of calibrated digital scale system on all trucks, with print out facility in truck cab.
– GPS Tracking to all vehicles to maintain project haul route compliance.
– Bulk Earthworks: Importing 64,000m3 of CBR 10

Challenges:   Surrounding community dust suppression

Proudly working alongside

DUAL TOWERS – FESTIVAL PLACE, NEWSTEAD

Project Name:    20 Festival Place, Newstead – Stage 2
Client:                    Torre Developments
Date:                       October 2019 – 2022

Dual Towers is located on Brisbane’s Festival Place, Newstead, Qld.

Stage 2 is a 25 story residential tower consisting of 176 dwellings, restaurants and shops, river views, basement parking, large roof top swimming pool, community vegetable gardens, driving range and much more.

Scope of works:    Haulage Contractor carrying out the following:

– Use of calibrated digital scale system on all trucks, with print out facility in truck cab.
– GPS Tracking to all vehicles to maintain project haul route compliance.
– Bulk Earthworks: Export of 100,000 loose m3 of PASS Material
– Major Piling works: Import Engineered Fill for Structural Piling Platform

Challenges:   Working around public traffic access.

Proudly working alongside:

SOUTH CITY SQUARE – PELLICANO MALL

Project Name:    South City Square
Client:                    South City Construct
Date:                     2012 – 2021

South City Square Project is located in the heart of Brisbane on Logan Rd Woolloongabba, Qld.

South City Square will comprise of community based living within residential towers with 5 level basement, al fresco dining, cinema, supermarkets, medical amenities , boutique stores and shopping mall surrounding a well landscaped open park.

Scope of works:    Haulage Contractor carrying out the following:

– Use of calibrated digital scale system on all trucks, with print out facility in truck cab.
– GPS Tracking to all vehicles to maintain project haul route compliance.
– Bulk Earthworks: Stage 4: carting of approx. 100,000m3 spoil, civil works at 90% completion early June 2020

Challenges:   Working with community compliances, other public/commercial vehicles and keeping the surroundings clean. Dust, machine/works vibration and noise compliances with community worries.

Proudly working alongside

JIMBOOMBA SHOPPING CENTER REDEVELOPMENT

Project Name:    Jimboomba Shopping Center Redevelopment
Client:                 Zagame Corporation & Pellicano
Project Value:     $14 Million
Date:                    October 2018 – December 2019

The Jimboomba Shopping Center Redevelopment is located on the Corner of Cusack Lane & Mount Lindsay Highway Jimboomba, QLD.

Revamping of the Jimboomba Shopping complex has commenced and will include a variety of 14 new food and lifestyle retailers along with health and wellness offerings.

Scope of works:    Haulage Contractor carrying out the following:

– Use of calibrated digital scale system on all trucks, with print out facility in truck cab.
– GPS Tracking to all vehicles to maintain project haul route compliance.
– Bulk Earthworks
– Demolition
– Supply of Gravel

Challenges:   The shopping complex will remain live throughout the entirety of the project.

Proudly working alongside

THE MILL

Project Name:    The Mill
Client:                 Orora – Petrie Paper Mill
Project Value:     $5 Million
Date:                    November 2018 – 2022

‘The Mill’ at Moreton Bay proposed development area will deliver a University for up to 20,000 students, Healthcare, residential and supporting infrastructure. This project will create significant cultural, sporting, recreational and environmental community owned facilities for the region.

Scope of works:    Haulage Contractor carrying out the following:

– Use of calibrated digital scale system on all trucks, with print out facility in truck cab.
– GPS Tracking to all vehicles to maintain project haul route compliance.
– 400,000 Tonne of Select Fill.
– Supply Drainage.
– 460 Hectare area

Challenges:   Sensitive Environmental requirements surrounding wildlife and providing infrastructure for Koala Crossings.
Strict access pathways throughout the premise.

Challenges:   Working over and adjacent to Energex easements, with controlled filling, works to protect the services from ground movement. High exposure site requiring careful interface with the public.

Proudly working alongside

BRISBANE AUTO MALL

Project Name:    Auto Mall Early Earth Works
Client:                 Brisbane Airport Corporation
Project Value:     $22 Million
Date:                    September 2017 – 2022

Scope of works:    Principal Contractor carrying out the following:

– 52 hectares of clearing and grubbing
– High strength fabric installation
– 750,000m3 of import and placement of structural fill
– Screw piling and concrete access works over HV
– Material processing
– Settlement monitoring
– ACM management
– ASS treatment
– Drainage works
– Erosion and sediment controls

Challenges:   Working over and adjacent to Energex easements, with controlled filling, works to protect the services from ground movement. High exposure site requiring careful interface with the public.

Challenges:   Working over and adjacent to Energex easements, with controlled filling, works to protect the services from ground movement. High exposure site requiring careful interface with the public.

Proudly working alongside:

QUEENS WHARF

Project Name:    Queens Wharf
Client:                 Mainland Civil/Probuild
Project Value:     $29 Million
Date:                    2018 – December 2019

Scope of works:    Spoil Haulage Contractor carrying out the following:

– Major spoil haulage of concrete, contaminated soils, overburden, Acids Sulphate Soils and Rock.
– Working both day and night shift i.e 24 hrs , carting approximately 4,000 tonnes per shift.
– Use of calibrated digital scale system on all trucks, with print-out facility in truck cab
– GPS tracking to all vehicles to maintain project haul route compliance.
– All material ( approx. 450,000M3 ) to be recycled, except for contaminated soils which will be disposed of at licenced landfill facility.

Challenges:   One of the biggest challenges of this project was organising a 24-hour Haulage solution through the CBD. We are working on a high exposure site requiring careful interface with the public.

Proudly working alongside:

GATEWAY UPGRADE NORTH 1 – Early Works

Project Name:    Gateway Upgrade North 1 – Early Works
Client:                 Fulton Hogan
Project Value:     $3 Million
Date:                   January 2015 – August 2015

Scope of works: Earthworks and Haulage Subcontractor carrying out the following:

– 200,000m3 of import and placement of structural fill
– 
ACM haulage
– ASS haulage and treatment
– Supply of drainage rock
– Plant Hire

Challenges:  filling operations alongside a live motorway, above traffic height and against working PCBs was managed safely in conjunction with Fulton Hogan’s delivery team.

Proudly working alongside:

Airport Industrial Park (Lots 1,2,3 & 4) – Bulk Earth Works

Project Name:    Gateway Upgrade North 1 – Early Works
Client:                  Brisbane Airport Corporation
Project Value:     $19 Million
Date:                    September 2015 – 2021

Scope of works: Principal Contractor carrying out the following:

– 24 hectares of clearing and grubbing
– 500,000m2 of filter fabric and high strength fabric installation
– 94,000m3 of drainage blanket installation
– 630,000m3 of import and placement of structural fill
– Material processing
– Settlement monitoring
– ACM management
– ASS treatment
– Drainage works
– Erosion and sediment controls

Challenges:  working directly under the runway, Timms had to comply with BAC Operations requirements to manage stockpile heights and perform night works.

Proudly working alongside:

Contact Us

Please fill in this form and we'll get back to you very quickly. You can also call us on 07 3266 1843

Not readable? Change text. captcha txt